Project Description

Location:   Fort Campbell, Kentucky
Installed Capacity: 4.39 MWdc/3.1MWac of energy
Year Commissioned:   2016

The objective of this innovative solar project was to design a project that locally generated renewable solar electricity to enhance energy security and provide price stability for Fort Campbell and meet the Army’s renewable energy goals. The project was broken up into two phases with Phase II located on approximately 25 acres of a capped landfill.

RRC provided the land surveying, preliminary civil engineering, geotechnical engineering, preliminary electrical engineering, preliminary SCADA design and project management services for the Phase II project site. RRC optimized the PV plant design to achieve the lowest overall lifecycle costs.