RRC helps renewable asset owners meet NERC-PRC-028 requirements across operating solar, wind, and battery storage sites. We combine electrical engineering, SCADA integration, and on-site field crews to take projects from initial gap reviews through installation, testing, and long-term support.Â
NERC Standard PRC-028-1 requires applicable Inverter-Based Resources (IBRs) to record and report time-synchronized data during grid disturbances.
At operating facilities, compliance is as much a field-execution challenge as it is an engineering requirement. RRC coordinates both.
We manage the entire scope in-house to avoid handoff delays and minimize plant downtime
Evaluate single lines, interconnection voltages, and monitoring hardware, then verify as built-in conditions on site.
Define recording parameters, map monitoring points, and build installation plans around operational constraints.
Integrate devices, configure storage and export workflows, and validate UTC time alignment and data accuracy.
Install hardware, verify triggers and sampling rates, and run end-to-end tests for capture and retrieval.
CAISO
ERCOT
SPP
MISO
PJM
NYISO
ISO-NE
AESO
Ontario IESO
RRC does not stop at an advisory report. Dedicated field crews translate the compliance plan into a safe, durable retrofit, working alongside electrical and SCADA engineers through commissioning and data-retrieval testing.Â
Tell us about your assets and how you prefer to connect. An RRC specialist can use the details to prepare for a focused technical conversation.Â
VP of On-Site Support
Quality Director of On-site Support
Vice President, SCADA